Boat Building Forum

Find advice on all aspects of building your own kayak, canoe or any lightweight boats

#2 is OK, also have done #1
By:Pete Ford
Date: 9/15/1998, 7:18 pm
In Response To: Stripping/Epoxy Construction Sequence (Randy Bertrand)

I've built two Georgian Bays and did one the #1 way and the other the #2 way. Both worked fine. I kinda preferred #2 since I was able to do all the stripping and then all the epoxying. The key is to put some tape along the joint between the hull and deck before you start the deck so that you can get it apart later after you glass and epoxy one of them!

Messages In This Thread

Stripping/Epoxy Construction Sequence
Randy Bertrand -- 9/15/1998, 10:06 am
Re: Stripping/Epoxy Construction Sequence
Wayne Bergman -- 9/17/1998, 12:28 pm
Re: Stripping/Epoxy Construction Sequence
Randy Bertrand -- 9/17/1998, 5:05 pm
#2 is OK, also have done #1
Pete Ford -- 9/15/1998, 7:18 pm
Re: Stripping/Epoxy Construction Sequence
Jay Babina -- 9/16/1998, 12:05 am