By:Ian Johnson
Date: 11/29/2010, 4:24 pm

: The temperatures that trigger the hardening process are not linear.
: Sometimes one or two more degrees will cause it to fire off at a
: much greater speed. You're probably sitting right at the
: temperature that is causing it to be quite slow.

Thanks (and thanks Bill too). You were right - it's set up nice and hard now. I am glad ... I wasn't too keen on running a razor blade along the completed seam ...

Regards, Ian

Messages In This Thread

Strip: Soft epoxy 18hrs after laying inside seam
Ian Johnson -- 11/29/2010, 12:57 am
Re: Strip: Soft epoxy 18hrs after laying inside se
Jay Babina -- 11/29/2010, 7:56 am
Strip: You're right - epoxy set hard now
Ian Johnson -- 11/29/2010, 4:24 pm
Re: Strip: Soft epoxy 18hrs after laying inside se
Bill Hamm -- 11/29/2010, 1:24 am
Re: Strip: Soft epoxy 18hrs after laying inside se
Ian Johnson -- 11/29/2010, 1:40 am
Measuring small amounts of epoxy
Allan -- 11/29/2010, 3:13 am
Re: Measuring small amounts of epoxy
Ken Blanton -- 11/29/2010, 5:45 pm
Re: Measuring small amounts of epoxy
Donovan -- 11/29/2010, 9:27 am
Re: Measuring small amounts of epoxy
richt -- 12/1/2010, 2:29 pm
Re: Measuring small amounts of epoxy
Bill Hamm -- 12/1/2010, 6:07 pm
Re: Measuring small amounts of epoxy
Bill Hamm -- 11/29/2010, 9:34 am