Re: Strip: Sequence of work on stripper?
By:Charles Robinson
Date: 4/6/2011, 7:14 pm
In Response To: Strip: Sequence of work on stripper? (Paul Lueders)

: Hull is glassed.

: 1. Do I glass the inside of the hull next? (Deck is complete
: (stripped not glassed yet), and sits on another set of horses
: with spreader sticks in place)

: 2. When do I put on fill coats of epoxy on the hull? (After the
: hull and deck are joined?)

: 3. When do you cut out the cockpit recess? (After deck is glassed
: or before?)

: Thanks for any advice!
: Paul
Fill coat(s) should be done ASAP. At least within 72 hrs of the glassing depending on the brand of epoxy. Read the epoxy manual. You want a chemical bond between the epoxy coats. If you wait too long, then you would have to do a mechanical bond, which means sanding, and you would sand through the fiberglass. Don't wait.

Charles Robinson

Messages In This Thread

Strip: Sequence of work on stripper?
Paul Lueders -- 4/6/2011, 5:30 pm
Re: Strip: Sequence of work on stripper?
StephenHJ -- 4/6/2011, 6:41 pm
Re: Strip: Sequence of work on stripper?
Charles Robinson -- 4/6/2011, 7:14 pm
Re: Strip: Sequence of work on stripper?
Bill Hamm -- 4/7/2011, 12:53 am
Re: Strip: Sequence of work on stripper?
Jay Babina -- 4/7/2011, 2:57 pm
Re: Strip: Sequence of work on stripper?
Ken F -- 4/7/2011, 5:01 pm
Re: Strip: Buy A Book
Charlie -- 4/7/2011, 11:29 pm
Re: Strip: Buy A Book
Dave Mckinney -- 4/9/2011, 7:53 pm
Re: Strip: Buy A Book
Paul Lueders -- 4/10/2011, 7:01 am
Re: Strip: Buy A Book
Bill Hamm -- 4/10/2011, 2:50 pm
off topic
Paul Lueders -- 4/10/2011, 7:05 am