Since you all were so helpful with your advice on clamping, I have another question. I'm using Titebond 3 and the temperature in my shop varies from 65 to 75 F. What should I figure for drying time until I can remove the clamps and start the next strip?
The Titebond site talks about open and closed assembly times, but I'm not sure what that means.
Also, can I use Titebond to scarf strips together (I scarf the wide edge)?