This archive is sponsored by Guillemot Kayaks . Go to the active forum to post new messages.

[ Return to Index ] [ Read Prev Msg ] [ Read Next Msg ]

KBBS Archive 60,000

S&G: WGW Construction Day 21:

Posted By: rb
Date: Thursday, 28 February 2002, at 1:15 p.m.

Today I was to glue the corner braces into the wherry. The front brace (breasthook) and the rear braces (knees) were to be glued with cabosil thickened epoxy.

First I tried to make a dry run and fit the braces. NONE of them fit. My filleting and fiberglass layers made the corners round. I used a rotary disc on my drill to grind the corners back for the 1" off the top. After that all three braces fit fine.

I mixed my epoxy and spread it on the sides like peanut butter on a toast. Clamps worked fine and the whole thing is curing right now.

I also needed to put my spreaders back into the boat. I started with the middle spreader at station 7. The sheer line was out about 1". I hotglued the bottom of the spreader and then used a rope twisting to "clamp" the hull back so that the sides of the spreaders at the sheer line met. I hot glued the whole thing. Then I hot glued stations 3 and 11. Tomorrow I will try to remove the rope hoping that it won't break the hot glue bond. I need to get the rope off because next I will need to glue the rubrails. The rope would be in the way of the rub rail.

rb

[ Return to Index ] [ Read Prev Msg ] [ Read Next Msg ]

KBBS Archive 60,000 is maintained by Nick Schade - Guillemot Kayaks with WebBBS 5.12.

 Guillemot | SEE Kayak Directory | Kayak Forum

The Kayak Forum is Sponsored By

Guillemot Kayaks

Guillemot Kayaks